Drilling foam wiper for oil & gas

Drilling foam wiper 5  inch drill pipe cementation in the drilling.

Drilling foam wiper 5 inch drill pipe cementation onshore and offshore applications.

Drilling foam wiper 5 inch drill pipe cementation for oilfields.

Drilling foam wiper Oman

The pipe wipers for drill pipe oil is designed to wipe drillpipe or tubing string clean of cement, fluids, or debris, and can be used to separate fluids.

These foam ball in liner cementing are made of natural rubber and can be used in a temperature range of 40°F (4°C) to 302°F (150°C). The ball has a parting stretch of 380 to 440%, which means it can pass through small restrictions without being damaged.

An oil platformoffshore platform, or (colloquially) oil rig is a large structure with facilities to drill wells, to extract and process oil and natural gas, or to temporarily store product until it can be brought to shore for refining and marketing. In many cases, the platform contains facilities to house the workforce as well.

Depending on the circumstances, the platform may be fixed to the ocean floor, may consist of an artificial island, or may float. Remote subsea wells may also be connected to a platform by flow lines and by umbilical connections. These subsea solutions may consist of one or more subsea wells, or of one or more manifold centres for multiple wells.

Around 1891, the first submerged oil wells were drilled from platforms built on piles in the fresh waters of the Grand Lake St. Marys (a.k.a. Mercer County Reservoir) in Ohio. The wide but shallow reservoir was built from 1837 to 1845 to provide water to the Miami and Erie Canal.

Around 1896, the first submerged oil wells in salt water were drilled in the portion of the Summerland field extending under the Santa Barbara Channel in California. The wells were drilled from piers extending from land out into the channel.

Advertisements